GammaManager Facebook  ●  investorinfo@gammamanager.com

EBM Investors

EBM Investors

Shareholder opportunities have recently become available, in the parent company of the EBM Clean Energy Technology. We are currently seeking an individual or an organization who has the substantial means and the intent of partnering with us to expand the EBM Clean Energy Technology to the next level. We are seeking a partner who can execute our shared mission of making our world a cleaner and safer place to live, at an affordable price.

The EBM Clean Energy Technology is unique in the non-fossil fuel industry. It operates singularly on its own non-toxic magnetic driving field for additional fuel. This unique quality sets the EBM Clean Energy Technology in a distinctive position regarding the economies of electric power generators. Please see below:

Economic Comparisons of Electric Power Generations of Different Technologies* of Utility Size Operation New Plants ≥ 250 Megawatts [MW] Using Euro [€] in 2017

EBM
Turn Key Cost [€/MW] 1.8 Million
Time required from pre-engineering to revenue producing [Year] 2 year
Annual Capacity Factor 95%
Cost/kWh (Excl. Subsidies) 3.07¢
Life Cycle Estimated [Year] 40 year
Solar
Turn Key Cost [€/MW] 6.2 Million
Time required from pre-engineering to revenue producing [Year] 8 year
Annual Capacity Factor 95%
Cost/kWh (Excl. Subsidies) 4.40¢
Life Cycle Estimated [Year] 20 year
Wind
Turn Key Cost [€/MW] 4.4 Million
Time required from pre-engineering to revenue producing [Year] 6 year
Annual Capacity Factor 95%
Cost/kWh (Excl. Subsidies) 6.60¢
Life Cycle Estimated [Year] 15 year
Advanced Nuclear
Turn Key Cost [€/MW] 6.6 Million
Time required from pre-engineering to revenue producing [Year] 8 year
Annual Capacity Factor 95%
Cost/kWh (Excl. Subsidies) 5.72¢
Life Cycle Estimated [Year] 40 year
Innovative Coal
Turn Key Cost [€/MW] 4.4 Million
Time required from pre-engineering to revenue producing [Year] 4 year
Annual Capacity Factor 95%
Cost/kWh (Excl. Subsidies) 6.53¢
Life Cycle Estimated [Year] 30 year
Innovative Natural Gas
Turn Key Cost [€/MW] 1.1 Million
Time required from pre-engineering to revenue producing [Year] 3 year
Annual Capacity Factor 95%
Cost/kWh (Excl. Subsidies) 7.78¢
Life Cycle Estimated [Year] 15 year

* Important notes regarding "Turn Key Cost" of Solar and Wind:

  1. Needed sizable investment not included to provide predictable MW power per day, based on the “name plate capacity”;
  2. Turn Key Cost of “name plate capacity“ is multiplied by 3 to make solar and wind comparable with the other generation technologies in the chart above due to their annual capacity factor of 33%, based on the wind or solar duration.

Only eligible individuals will be contacted. The successful candidates, with their qualified team of experts and professionals, will have the technology demonstrated to them.